总结了宁波城区电网近两年多来在变电站综合自动化系统的建设和改造方面的经验。对应用的3套典型的国产变电站综合自动化装置和1套集控中心监控系统的运行情况作了分析和技术经济比较;同时对综合自动化系统的运行、维护和管理工作进行了探讨。
Abstract:The construction and retrofits of substation integrated automation system for Ningbo power networkare summarized Furthermore, operation of the three sets of typical domestic substation integrated automationdevices and a SCADA/MIS system are analyzed and compared in both techniques and economics aspects.
基本信息:
DOI:10.19585/j.zjdl.1997.06.004
中图分类号:TM76
引用信息:
[1]周子正.宁波电网变电站自动化建设与改造[J].浙江电力,1997(06).DOI:10.19585/j.zjdl.1997.06.004.