浙江电力

2016, v.35;No.238(02) 72-75

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

温州电网110kV及以上隔离开关运维检修管理新模式
Operation and Maintenance Management of 110 kV and above Isolating Switch of Wenzhou Power Grid and the Implementation

陈植,李勇
CHEN Zhi,LI Yong

摘要(Abstract):

总结温州电网110 kV及以上隔离开关运行中常出现的故障及检修中存在的问题,提出强化集中检修、工厂化检修,深化精益化检修,打造主动检修体系,展开差异化检修的管理模式,积极探索和实践科学高效的检修模式,并加强隔离开关大修和隐患治理执行力度,最终提高检修效率,有效提升了设备运行水平。
By summarizing frequent faults in the operation of 110 kV and above isolating switch of Wenzhou power grid as well as problems in maintenance,the paper suggests strengthening centralized maintenance and factory maintenance,deepening lean maintenance,creating proactive maintenance system and implementing differential maintenance management; besides,it aims to positively explore and implement scientific and efficient maintenance mode and reinforce isolating switch overhauling and treatment of potential risks to improve maintenance efficiency and equipment operation level.

关键词(KeyWords): 隔离开关;运维检修;集中检修;工厂化检修;精益化管理;差异化检修
isolating switch;operation and maintenance;centralized maintenance;factory maintenance;lean management;differential maintenance

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 陈植,李勇
CHEN Zhi,LI Yong

DOI: 10.19585/j.zjdl.2016.02.018

参考文献(References):

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享