嘉兴发电厂一期工程给水泵选型和试运行情况分析
Selection and Trial Operation Analysis of Feedwater Pumps of Jiaxin Power Plant Phase I

朱松强,郑重理
Zhu Songqiang ; Zheng Zhongli;

摘要(Abstract):

给水系统的设计、设备选型以及安装、调试对于保证给水系统和整台机组的安全运行具有十分重要的意义。本文介绍了嘉兴发电厂一期工程给水系统设计、选型意图以及调试、试运过程出现的一些问题的处理方法和防止对策,可供300MW、600MW机组给水泵选型、调试参考或借鉴。
Design of feedwater system, selection, erection and commioning of the equipment play an important role in the safe operation of feedwater system and the Unit. This paper intnduces some methods and treatment towards the design of fedwater system, selection, commissioning and trial operation, which can make reference to the selection of fedwater pump, coedssioning of the unit of 300 MW and 600 MW.

关键词(KeyWords): 给水泵;选型;调试
fedwater pump, selection commissioning

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 朱松强,郑重理
Zhu Songqiang ; Zheng Zhongli;

DOI: 10.19585/j.zjdl.1998.04.003