浙江电力

2004, (02)

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

汽轮发电机定子增容改造的分析
Analysis of Capacity Increasing Process on Turbine-generator Stator

陈磊,冯卫

摘要(Abstract):

文章简要介绍了发电机增容改造工程的概况。基于对限制发电机容量因素的讨论 ,主要对发电机定子部分在增容改造过程中所需解决的问题和采用的相应技术措施进行分析。
This paper briefly introduces the project of capacity increasing process on turbine-generator staˉtor.Based on the discussion of the factor which limits generator's capacity,the problems which needed to solve and the ways which can be used in the capacity increasing process are also analysed.

关键词(KeyWords): 汽轮发电机;增容;定子;冷却器;挡风圈,电屏蔽环
turbine-generator;capacity increasing process;stator;cooler;windshield;electromagnetˉic-shield

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 陈磊,冯卫

DOI: 10.19585/j.zjdl.2004.02.003

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享