直流电源双重化改造不停电策略研究与实践Research and Practice of DC Power Double Renovation without Power Outage
仇群辉,傅进,费云中,颜彦
QIU Qunhui,FU Jin,FEI Yunzhong,YAN Yan
摘要(Abstract):
结合直流电源双重化改造实践,对一次设备停电方式、保护轮停方式和不停电方式下设备操作量、操作时间、作业人数以及改造时间进行比较分析,研究出一种不停电改造方法并建议推广应用。
Through double renovation of DC power, equipment operation amount, operation time, number of operators and renovation time of primary equipment outage, alternate outage of relay protection and non-outage are compared and analyzed. In the final, a non-outage scheme is developed and widely applied.
关键词(KeyWords):
不停电;直流电源;改造
non-outage;DC power;renovation
基金项目(Foundation):
作者(Author):
仇群辉,傅进,费云中,颜彦
QIU Qunhui,FU Jin,FEI Yunzhong,YAN Yan
DOI: 10.19585/j.zjdl.2015.12.007