500kV架空地线金具发热的分析与对策Analysis and Countermeasure of Hardware Heating for 500 kV Overhead Ground Wire
黄巍,程泳,董建新,胡俊华,钱国钟
HUANG Wei,CHENG Yong,DONG Jian xin,HU Jun hua,QIAN Guo zhong
摘要(Abstract):
结合500 kV乔司变电站实测结果,分析架空地线接地方式对金具发热的影响。架空地线直接接地的接地环流是引起发热的主要原因,并带来输电损耗;采用分段绝缘单点接地虽然可以消除环流、降低损耗,但架空地线的感应电压高,在使用上有一定的局限性。针对这一问题,提出奇数段接地、偶数段换位的接地方式。利用500 kV双架空地线感应电压近乎反相的特点,通过换位策略中和架空地线的感应电压,减小了接地环流和输电损耗,换位后的架空地线分流系数变化不大,对跨步电压的影响不大,保证了安全性。
Combined with the actual measurement result of 500 kV Qiaosi substation, the impact of grounding mode of overhead ground wire on hardware heating is analyzed. The grounding circulating current brought by the direct grounding of overhead ground wire is the main reason of hardware heating and results in transmis- sion loss. Though the section insulation and same point grounding method can eliminate circulating current and reduce the loss, there is high induced voltage on overhead grounding wire, which poses limitation to the use. Aiming at this problem, the method of odd number section grounding and even number section transposi- tion is proposed. By using the characteristic that the voltage phase of the double overhead ground wires is nearly opposite, the induced voltage of overhead grounding wire is neutralized through transposition strategy, grounding circulating current and transmission loss are reduced. The current sharing factor of overhead grounding wire after transposition changes little, bringing less impact on step voltage and ensuring the safety.
关键词(KeyWords):
架空地线;金具发热;OPGW;接地方式;环流
overhead ground wire;hardware heating;OPGW;grounding mode;circulating current
基金项目(Foundation):
作者(Author):
黄巍,程泳,董建新,胡俊华,钱国钟
HUANG Wei,CHENG Yong,DONG Jian xin,HU Jun hua,QIAN Guo zhong
DOI: 10.19585/j.zjdl.2013.11.009
参考文献(References):
- [1]张殿生.电力工程高压送电线路设计手册[M].2版.北京:中国电力出版社,2002.
- [2]DL/T 621-1997交流电气装置的接地[S].北京:中国电力出版社,1997.
- [3]颜天佑,黄业同,杨长辉.110 kV同塔六回输电线路避雷线损耗研究[J].电力学报,2012,27(1):5-9.
- [4]缪晶晶,徐志磊,冒新国,等.OPGW接地方式研究及分段绝缘方案设计[J].电力系统通信,2012,33(231):47-51.
- [5]彭向阳,刘毅刚,张穗强.OPGW光纤复合架空地线异常发热现场测量分析及仿真[J].电网技术,2012,36(2):206-211.
- [6]葛猛,姜大宇.架空地线耐张线夹过热原因分析[J].电力安全技术,2005,4(7):17-22.
- [7]刘玲,郑斯聪,蒋健,等.一起光纤复合地线搭接地点熔断案例的分析[J].广东电力,2009,22(10):60-63,74.
- [8]杨挺.500 kV输电线路架空绝缘地线掉线原因及对策[J].电力安全技术,2005,7(12):4-6.
- [9]朱发强.OPGW使用寿命及光中继路由可用性问题的研究[J].电力系统通信,2004(2):25-30.
- [10]王学军.超高压送电线路OPGW不同接地方式分析[J].电工技术,2011(12):47-49.
- [11]韩立奎,张兆华,韩晓冰,等.220 kV输电线路OPGW光缆接地方式改进分析[J].光通信技术,2011,6:33-35.