大型核电机组接入电网的稳定性研究Investigation on Stability of Large-scale Nuclear Power Units Connected to the Grid
钟磊,欧阳利平,蔡红霞,郭俊辉
ZHONG Lei,OUYANG Li ping,CAI Hong xia,GUO Jun hui
摘要(Abstract):
核电机组具有单机容量大、核安全要求高,且对电网扰动敏感等特征。以大型压水堆核电机组为研究对象。建立了压水堆模型,利用时域仿真法及暂态能量函数法研究了核电接入电网的暂态稳定性,以三门核电机组接入浙江电网的枯水季节最大运行方式作了算例分析。仿真计算了电网短路故障和N-2故障类型扰动下的系统及核电机组的暂态稳定性。结果表明,三门核电机组能承受电网的一般故障且接入对电网暂态稳定的影响很小,电网具有较强的稳定性。
Nuclear power units are characterized by large unit capacity, high nuclear safety requirements, sensitivity to grid disturbance and so on. In this paper, the study subject is large pressurized water reactor nuclear power plants. The model of the pressurized water reactor is established, and the transient stability of the nuclear power connected to the grid is studied using time-domain simulation method and transient energy function method. The paper analyzes maximum operating mode in dry season of Sanmen Nuclear Power Plant when connected to Zhejiang power grid. The simulation calculates the transient stability of the system and the nuclear power units suffering multiple types of fault disturbances such as grid short-circuit fault and N-2 fault. The result shows that Sanmen Nuclear Power Plant can withstand common faults and has little influence on the transient stability of power grid. This system is strongly stable.
关键词(KeyWords):
压水堆核电机组;电网;仿真计算;暂态稳定
pressurized water reactor nuclear power units;power grid;simulated calculation;transient stability
基金项目(Foundation):
作者(Author):
钟磊,欧阳利平,蔡红霞,郭俊辉
ZHONG Lei,OUYANG Li ping,CAI Hong xia,GUO Jun hui
DOI: 10.19585/j.zjdl.2013.11.005
参考文献(References):
- [1]中国国家发展与改革委员会.核电中长期发展规划(2005~2020年)[R].2007.
- [2]World Association of Nuclear Operators.WANO Significant Operating Experience Reports and the 2004 Addendum:Loss of Grid[R].2004.
- [3]WANG DA OUANG.Conventional and Specil SecurityStability Measures for Power System Connected with Large Generating Units[J].Internation Conference on Power System Technology,IEEE CSEE,1991:84.
- [4]赵洁,刘涤尘,吴耀文.压水堆核电厂接入电力系统建模[J].中国电机工程学报,2009,29(31):8-13.
- [5]XI SHI,JIE ZHAO HAO,DICHEN LIU.The Simulation of Pressurized Water Reactor NPP Physical Process[J].IEEE SOSE,2009:84.
- [6]王大光,王凌,张榕林,等.大型核电厂接入福建省电力系统中的研究[J].福建电力与电工,1994,14(4):8-13.
- [7]赵洁,刘涤尘,吴萍,熊莉,雷庆生,杜治.新一代核电机组接入电网后的相互影响研究[C].北京:中国高校电力系统及其自动化专业第25届学术年会,2009.
- [8]林诚格,郁祖盛,欧阳予.非能动安全先进核电厂AP1000[M].北京:原子能出版社,2008.
- [9]宋方方.基于广域同步信息的暂态稳定评估方法和控制策略研究[D].北京:华北电力大学,2007.
- [10]刘峰,邱家驹.基于非均匀阻尼模型的二阶上界函数暂态稳定域估计方法[J].中国电机工程学报,2005,25(13):19-23.