考虑全寿命周期的电力设备可靠性分析Reliability Analysis of Electric Power Equipment Considering Full Life Cycle
吴良建,祝刚,许哲伟,郑燃,毛水强
WU Liangjian,ZHU Gang,XU Zhewei,ZHENG Ran,MAO Shuiqiang
摘要(Abstract):
电力系统输变电设备的全寿命周期管理对于电力系统可靠性规划具有重要的意义。在介绍设备全寿命周期基础上,按设备投运的不同阶段,分别建立了投运早期、常态运行期和加速老化期的故障率模型,对比了设备老化不可用率的仿真结果,验证了序贯蒙特卡洛仿真的可行性,对比分析了2种适用于设备故障率的可靠性评估方法。
Full life cycle management of power transmission and transformation equipment means much to reliability planning of power system. By introduction of equipment life cycle of failure rate models are established respectively in accordance with different stages of equipment operation such as earlier operation period,normal operation period and accelerated aging period. By comparing simulation results of aged equipment unavailability, this paper proves feasibility of sequential Monte Carlo simulation and comparatively analyzes two reliability evaluation methods for equipment failure rate.
关键词(KeyWords):
全寿命周期;故障率;老化不可用率;序贯蒙特卡洛法
full life cycle;failure rate;unavailability of aged equipment;sequential Monte Carlo method
基金项目(Foundation):
作者(Author):
吴良建,祝刚,许哲伟,郑燃,毛水强
WU Liangjian,ZHU Gang,XU Zhewei,ZHENG Ran,MAO Shuiqiang
DOI: 10.19585/j.zjdl.2015.11.016
参考文献(References):
- [1]BILLINTON R,ACHARYA J R.Weather-based distribution system reliability evaluation[J].Iee ProceedingsGeneration Transmission and Distribution,2006,153(5):499-506.
- [2]HAGKWEN K,SINGH C.Reliability Modeling and Simulation in Power Systems With Aging Characteristics[J].IEEE Transactions on Power System,2010,25(1):21-28.
- [3]CHU C M,MOON J F,LEE H T,et al.Extraction of Time-varying Failure Rates on power distribution system equipment considering failure modes and regional effects[].International Journal of Electrical Power&Energy Systems,2010,32(6):721-727.
- [4]XIE K G,LI W Y.Analytical model for unavailability due to aging failures in power systems[J].International Journal of Electrical Power&Energy Systems,2009,31(7):345-350.
- [5]LI W Y.Incorporating aging failures in power system reliability evaluation[J].IEEE Transactions on Power Systems,2002,17(3):918-923.
- [6]BILLINTON R,WANG DEE W.Predicting bulk electricity system reliability performance indices using sequential Monte Carlo simulation[J].IEEE Transactions on Power Delivery,2006,25(6):909-917.
- [7]段东立,武小悦,邓宏钟.基于时变故障率与服务恢复时间模型的配电系统可靠性评估[J].中国电机工程学报,2011,31(28):57-64.
- [8]赵渊,周家启,周念成,等.大电力系统可靠性评估的解析计算模型[J].中国电机工程学报,2006,26(05):19-25.
- [9]李文沅.电力系统风险评估模型、方法和应用[M].北京:科学出版社,2005.
- [10]BILLINTON R,WANG P.Teaching distribution system reliability evaluation using Monte Carlo simulation[J].IEEE Transactions on Power Systems,1999,14(2):397-403.
- [11]DUAN DONG LI,WU XIAOYUE,DENG HONGZHONG.Reliability Evaluation of Distribution Systems Based on Time-varying Failure Rate and Service Restoration Time Model[J].Proceedings of the CSEE,2011,31(28):57-64.
- [12]BILLINTON R,KUMAR S,CHOWDHURY N,et al.A re liability test system for educational purposes-basic data[J].IEEE Transactions on Power Systems,1989,4(3):1238-1244.
- [13]RUBINSTEIN R Y.Simulation and the Monte Carlo Methods[M].New York:Wiley,1981.
- [14]LEWIS P A W,SHEDLER G S.Simulation of non-homogeneous processes by thinning[J].Naval Res Logist,2006,26(3):403-413.
- [15]BENATO R,NAPOLITANO D.Overall Cost Comparison Between Cable and Overhead Lines Including the Costs for Repair After Random Failures[J].IEEE Transactions on Power Delivery,2012,27(3):1213-1222.