大型火电机组低加疏水不畅问题的分析及对策
Analysis and Countermeasure against Blocked Drain in LP Heater for Large Thermal Power Generating Unit

董益华,孙永平,应光耀,吴文健,楼可炜
DONG Yi-hua,SUN Yong-ping,YIANG Gang-yao,WU Wen-jian,LOU Ke-wei(Z(P)EPC Electric Power Research Institute

摘要(Abstract):

针对300 MW与600 MW机组7号、8号低加疏水系统存在全负荷段无法投入自动的现象,分析了疏水不畅的原因,进而提出了改进措施。结合现场实际情况,在某600 MW机组上取得了成功应用,提高了机组运行的安全性和经济性。
The paper introduces operation failure of low-pressure heaters No.7 and No.8 of 300 MW and 600 MW units in full load.It analyzes causes for blocked drain and hence proposes solutions and ideas for retrofit,which,in combination with field practice,turns out to be a success in 600 MW units and improves safety and economic efficiency of unit operation.

关键词(KeyWords): 火电机组;低加;疏水不畅;改进
thermal power generating unit;LP heater;blocked drain;retrofit

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 董益华,孙永平,应光耀,吴文健,楼可炜
DONG Yi-hua,SUN Yong-ping,YIANG Gang-yao,WU Wen-jian,LOU Ke-wei(Z(P)EPC Electric Power Research Institute

DOI: 10.19585/j.zjdl.2013.01.012

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享