浙江电力

2010, v.29;No.167(03) 22-25

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

西门子断路器二次回路施工调试中应注意的问题
Attentions in Construction and Debugging of Secondary Circuit of Siemens Breaker

钱嘉
QIAN Jia(Zhejiang Electric Power Training Center Zhexi Branch

摘要(Abstract):

对西门子断路器二次回路在施工及调试中遇到的问题进行归纳总结和分析,并提出相应的改进处理措施,确保西门子断路器二次回路能正确运行。
The paper sums up and analyses the problems in construction and debugging of Siemens breaker,and points out some improvement methods in order to make the corresponding choice for the proper operation of secondary circuit of the siemens breaker.

关键词(KeyWords): 断路器;防跳;继电器;参数匹配
breaker;trip-proof loop;relay;parameter matching

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 钱嘉
QIAN Jia(Zhejiang Electric Power Training Center Zhexi Branch

DOI: 10.19585/j.zjdl.2010.03.007

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享