浙江电力

2009, v.28;No.164(06) 31-33

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

500kV变电站远动系统配置优化分析
Configuration Optimization and Debugging Analysis of Remote Control System on 500 kV Substation

丁峰
DING Feng(Zhejiang Electric Power Test and Research Institute

摘要(Abstract):

针对500kV常规变电站远动系统配置方案的不足,设计了一种可用于500kV数字化变电站的远动系统优化配置方案,详细分析了该配置方案的实现方式和技术优势。该配置方案能较好地适应IEC61850标准,已在浙江省500kV变电站投入应用,对国内数字化变电站的建设具有一定的借鉴意义。
To resolve the limitation of remote control system configuration on 500 kV substation,the paper designs a more reliable remote control system configuration which can be used on digital 500 kV substation.Then the paper analyzes the realization means and technology advantage of the configuration.Finally it is pointed out that this configuration can be preferably applied in 500 kV substation based on IEC 61850,and it also can be used for reference by digital substation in China.

关键词(KeyWords): 500kV变电站;远动系统;配置方案;IEC 61850
500 kV substation;remote control system;IEC 61850

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 丁峰
DING Feng(Zhejiang Electric Power Test and Research Institute

DOI: 10.19585/j.zjdl.2009.06.009