浙江电力

2013, v.32;No.206(06) 5-9

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

浙江电网在运变压器套管末屏接地结构分析
Earthing Structure Analysis of In-service Transformer Bushing Tap in Zhejiang Power Grid

邹国平,何文林,孙翔
ZOU Guo-ping,HE Wen-lin,SUN Xiang(Z(P)EPC Electric Power Research Institute

摘要(Abstract):

针对变压器套管状态检修中出现的带电检测接口难点问题,统计分析了浙江电网变压器套管厂家分布情况,对主要的9个厂家15种套管末屏接地方式进行了研究。从信号引出的角度,将这15种末屏接地结构分为插拔式、螺纹式和特殊式3种结构,可为套管带电检测接口的研究提供参考。
Aiming at the difficulty in live detection interface in condition-based maintenance of transformer bushing,the paper statistically analyzes distribution of transformer bushing manufacturers in Zhejiang power grid and investigates 15 earthing modes of bushing tap from 9 manufacturers.The 15 earthing structures are divided into plug-insert type,screw type and special type in terms of signal eduction,which provides reference for research on live detection interface of bushing.

关键词(KeyWords): 变压器套管;末屏接地结构;接地端子;带电检测
transformer bushing;end layer earthing structure;ground terminal;live detection

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 邹国平,何文林,孙翔
ZOU Guo-ping,HE Wen-lin,SUN Xiang(Z(P)EPC Electric Power Research Institute

DOI: 10.19585/j.zjdl.2013.06.002

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享