500kV双龙变直流融冰系统施工中相关问题的处理Solutions to Problems During Construction of DC Deicer SVC System at Shuanglong 500 kV Substation
章伟勇,赵寿生,毛航旗,吴良建
ZHANG Wei-yong,ZHAO Shou-sheng,MAO Hang-qi,WU liang-jian(Jinhua Electric Power Transmission and Transformation Engineering Co.
摘要(Abstract):
应用于500 kV双龙变的直流融冰兼SVC系统是浙江省电力公司最新组织研发的融冰技术方案,能为电网提供两种功能,即融冰和动态无功补偿。重点分析了融冰工程施工过程中的相关问题,总结积累施工经验,为融冰方案的优化设计提供借鉴。
The DC Deicer SVC system applied at Shuanglong 500 kV substation was newly developed by Zhejiang Electric Power Corporation,providing two functions for power grid: deicing and Static VAR Compensation(SVC).This paper focuses on the analysis of the problems related to the deicer construction,summarizes the experience during the construction and can serve as a reference for optimal design of deicer plan.
关键词(KeyWords):
直流融冰;动态无功补偿;500kV;施工;金具
DC deicer;static var compensation;500 kV;construction;electric power fitting
基金项目(Foundation):
作者(Author):
章伟勇,赵寿生,毛航旗,吴良建
ZHANG Wei-yong,ZHAO Shou-sheng,MAO Hang-qi,WU liang-jian(Jinhua Electric Power Transmission and Transformation Engineering Co.
DOI: 10.19585/j.zjdl.2010.12.008
参考文献(References):
- 章伟勇
- 赵寿生
- 毛航旗
- 吴良建
ZHANG Wei-yong - ZHAO Shou-sheng
- MAO Hang-qi
- WU liang-jian(Jinhua Electric Power Transmission and Transformation Engineering Co.
- 章伟勇
- 赵寿生
- 毛航旗
- 吴良建
ZHANG Wei-yong - ZHAO Shou-sheng
- MAO Hang-qi
- WU liang-jian(Jinhua Electric Power Transmission and Transformation Engineering Co.