火电厂基建调试中的节能手段探讨
Exploration on Energy Conservation Methods During Capital Construction Commissioning in Thermal Power Plants

王达峰,方天林,罗辇
WANG Da-feng 1,FANG Tian-lin1,LUO Nian2(1.Zhejiang Electric Power Test and Research Institute

摘要(Abstract):

介绍了近年来在火电基建调试中采取的一些节能措施,从借助外部条件及内部挖潜两大方面进行了阐述,重点介绍了不带循环水泵进行机组分系统调试的技术。
This paper introduces some methods for energy conservation during capital construction commissioning in thermal power plants in recent years.It elaborates in terms of utilizing external conditions and exploring internal potential and describes the technologies of unit subsystem commissioning without circulating water pump.

关键词(KeyWords): 火电厂;基建调试;无循环水泵;节能减排
thermal power plant;capital construction commissioning;without circulating water pump;energy conservation and emission reduction

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 王达峰,方天林,罗辇
WANG Da-feng 1,FANG Tian-lin1,LUO Nian2(1.Zhejiang Electric Power Test and Research Institute

DOI: 10.19585/j.zjdl.2012.01.011

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享