浙江电力

2010, v.29;No.173(09) 8-10+35

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

嘉兴电网变电站程序化操作应用与探讨
Application and Discussion on Sequential Operation of Substations in Jiaxing Power Grid

沈曙明,徐明,陈鼎
SHEN Shu-ming,XU Ming,CHEN Ding(Jiaxing Electric Power Bureau

摘要(Abstract):

结合嘉兴电网变电站程序化操作的开展情况,着重分析了程序化操作实施过程遇到的有关技术和管理方面的问题,提出旨在规范程序化操作的技术和管理的相关建议,以便提高应用水平,促进程序化操作的推广应用。
Based on the application of sequential operation of substations in Jiaxing power grid,this paper analyzes the technical and management problems during the implementation,puts forward the proposals of technology and management aiming to standardize the sequential operation in order to improve the application and promote the development.

关键词(KeyWords): 变电站;程序化;操作;应用;探讨
substation;sequential operation;operation;application;discussion

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 沈曙明,徐明,陈鼎
SHEN Shu-ming,XU Ming,CHEN Ding(Jiaxing Electric Power Bureau

DOI: 10.19585/j.zjdl.2010.09.003

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享