300MW机组中压缸启动过程的分析与探讨
Analysis and Discussion on the MP Cylinder Start-up Process of 300 MW Unit

屠海彪,郑肖康
TU Hai-biao,ZHENG Xiao-kang (Taizhou Power Plant

摘要(Abstract):

简要介绍了台州发电厂五期工程N300-16.7/538/538汽轮机中压缸启动过程和特点,具体分析了启动阶段DEH的动作程序及运行操作步骤,重点对机组并网及切缸过程中相关参数的控制及需要注意的问题作了分析与探讨,并就完善相关逻辑及操作方法提出建议。
The paper briefly introduces the MP cylinder start-up's process and characteristics of the N30016.7/538/538 steam turbines in Taizhou Power Plant's Phase V projects.DEH action procedure and operation steps in start-up stage are analyzed specifically.Parameter control and considerations in the process of unit's synchronization and cylinder transfer are mainly analyzed and discussed,and some proposas on improving logic and operation methods are presented.

关键词(KeyWords): 汽轮机;中压缸启动;切缸
steam turbine;MP cylinder start-up;cylinder transfer

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 屠海彪,郑肖康
TU Hai-biao,ZHENG Xiao-kang (Taizhou Power Plant

DOI: 10.19585/j.zjdl.2010.06.007