介绍了FOUNDATION FIELDBUS现场总线的特点和调试步骤,结合660 MW超超临界燃煤机组的投产调试,从现场总线物理连接层和软件组态配置层2个方面进行了全面的分析,逐一提出了调试运行中应注意的问题,为现场总线的推广应用提供借鉴。
The paper introduces advantages and commissioning steps of FOUNDATION FIELDBUS and comprehensively analyzes physical connection layer and software configuration layer of fieldbus in accordance with the commissioning of 660 MW ultra-supercritical coal-fired units; besides, it presents precautions in commissioning one after another to provide a reference for fieldbus popularization and application.
关键词(KeyWords):
火电厂;FOUNDATION FIELDBUS;现场总线;应用
thermal power plant;FOUNDATION FIELDBUS;field bus;application