浙江电力

2010, v.29;No.174(10) 6-8

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

500 kV直流融冰兼动补装置水冷系统现场试验及改进
Field Test and Improvement of Water Cooling System in 500 kV DC Deicer and SVC

陆翌,胡文堂,陈金法,赵启承,金涌涛,汪科,赵文渊
LU Yi,HU Wen-tang,CHEN Jin-fa,ZHAO Qi-cheng,JIN Yong-tao,WANG Ke,ZHAO Wen-yuan(Zhejiang Electric Power Test & Research Institute

摘要(Abstract):

介绍了500 kV直流融冰兼动态无功补偿系统装置水冷系统的构造及基本原理,对现场调试时遇到的主要技术问题进行了分析,并阐述了相应的措施及修改方案。
This paper introduces the structure and basic principles of the water cooling system in the 500 kV DC Deicer and SVC,analyzes the main technical problems found during field commissioning and proposes the solutions and modification plan.

关键词(KeyWords): 直流融冰;晶闸管;水冷系统;现场调试;试验分析
DC deicer;thyristor;water cooling system;on-site commissioning;test analysis

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 陆翌,胡文堂,陈金法,赵启承,金涌涛,汪科,赵文渊
LU Yi,HU Wen-tang,CHEN Jin-fa,ZHAO Qi-cheng,JIN Yong-tao,WANG Ke,ZHAO Wen-yuan(Zhejiang Electric Power Test & Research Institute

DOI: 10.19585/j.zjdl.2010.10.002

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享