浙江电力

2013, v.32;No.203(03) 61-63+68

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

地县调控一体化技术支持系统项目管理的实践
Project Management Practice of Technical Support System for Integrated Prefecture-County Dispatching and Control

卢冰,陈家乾,杨力强,黄申,许琰
LU Bing,CHEN Jia-qian,YANG Li-qiang,HUANG Shen,XU Yan(Huzhou Electric Power Bureau

摘要(Abstract):

地、县调控一体化技术支持系统项目复杂,涉及专业部门众多,管理难度大。将传统工程项目管理方法与敏捷管理相结合,确立了融合计划性、可控性、适应性和创新性的管理理念。在项目管理过程中,以计划为基础,突出服务意识,因事制宜的灵活运用管理理论,以创造性思维解决问题,取得了良好效果,确保了项目建设达到预期目标。
The project of technical support system for integrated prefecture-county dispatching and control is complex and relates to many specialized departments,and there is difficulty in management.By combining conventional project management method with agile management,the paper establishes a management concept comprising planning,controllability,adaptability and creativity.In the process of project management,the planning is taken as the basis and the service consciousness is emphasized;the management theory was used flexibly and the problems was solved by creative thinking,from which good results were achieved and the anticipated goals of project construction were reached.

关键词(KeyWords): 规划;适应;创新
planning;adaptation;innovation

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 卢冰,陈家乾,杨力强,黄申,许琰
LU Bing,CHEN Jia-qian,YANG Li-qiang,HUANG Shen,XU Yan(Huzhou Electric Power Bureau

DOI: 10.19585/j.zjdl.2013.03.018

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享