适用于特高压主变压器现场安装的充气柱式保温房设计与实施Design and Implementation of Inflatable Column-type Thermal Insulation Room for Site Installation of UHV Main Transformer
刘博,侯纪勇,阎国增
LIU Bo,HOU Jiyong,YAN Guozeng
摘要(Abstract):
在我国1 000 kV特高压交流输变电工程建设规划中,部分施工区间处于冬季高寒低温时间段,而特高压主要设备在安装过程中热油循环的相关标准规定其温度不得低于65℃。而部分施工地区冬季最低温度低于-20℃,这严重影响了特高压主变压器及电抗器的安装。为了解决这一问题,提出了利用充气柱式保温房对施工过程中的特高压主设备进行保温的技术方案,通过对充气柱式保温房的换热特性进行分析,提出了适用于特高压主变压器的保温房设计方案。进一步设计出一种用于特高压主变压器安装的充气柱式保温房,并应用于蒙西特高压变电站的冬季施工现场,获得了良好的保温效果。
In China's 1 000 kV UHV AC transmission and transformation project construction planning,some construction zones are in the winter cold and low-temperature period while the temperature of hot oil cannot be lower than 65℃ as specified by relevant standards during installation of main equipment.However,the lowest temperature in some construction areas is below-20℃ in the winter time,which brings difficulties to UHV main transformer and reactor installation.Therefore,this paper puts forward a technical scheme of thermal insulation for the UHV main equipment in the construction process by using the inflatable column insulation room;through the analysis of the heat transfer characteristic of the inflatable column insulation room,it puts forward a design scheme of the insulation room which is suitable for the UHV main transformer.The design of an inflatable column-type insulating room for UHV reactor installation and its application in the winter construction site of Mengxi UHV substation have obtained good insulation effect.
关键词(KeyWords):
高寒地区;特高压交流;变压器;充气柱式保温房
alpine area;UHVAC;transformer;inflatable column-type thermal insulation room
基金项目(Foundation):
作者(Author):
刘博,侯纪勇,阎国增
LIU Bo,HOU Jiyong,YAN Guozeng
DOI: 10.19585/j.zjdl.201810008
参考文献(References):
- [1]李茂奇.北方地区混凝土桥梁冬季施工保温措施应用技术研究[J].混凝土世界,2013(11):72-75.
- [2]王朝军.浅谈桥梁冬季施工保温措施[J].河南水利与南水北调,2010(2):59-60.
- [3]张伟.浅谈桥梁冬季施工方案[J].黑龙江交通科技,2015(2):113.
- [4]杨水叶.西安市引湑济黑调水工程黑老路桥梁工程冬季施工保温措施研究[J].水利与建筑工程学报,2012,10(4):178-180.
- [5]邵艳.桥梁冬季施工的研究与探讨[J].交通标准化,2012(21):98-101.
- [6]张东.混凝土桥梁冬季施工方案及防裂措施[J].山西建筑,2014,40(17):137.
- [7]刘锐,李金忠,张书琦,等.大型变压器现场热干燥方法的研究与应用[J].中国电机工程学报,2012,32(1):193-198.
- [8]许伟民,江友钿,甘军明,等.特高压变压器油处理系统设计[J].机电工程技术,2011(11):109-110.
- [9]蔺争艳.桥梁悬臂现浇混凝土冬季施工保温措施[J].山西建筑,2015,41(15):173-174.
- [10]王玉明.浅谈1 000 kV特高压变压器施工监理方法[J].设备监理,2012(10):50-56.