基于最大供电能力的配电系统薄弱环节分析Analysis on Weak Links of Distribution System Based on Total Supply Capability
王波,何宇,张志雄,张兴
WANG Bo,HE Yu,ZHANG Zhixiong,ZHANG Xing
摘要(Abstract):
通过分析配电网最大供电能力影响因素,建立了变电站供电能力和网络转供能力相结合的最大供电能力计算模型,对某地区配电系统最大供电能力进行计算,并借助最大供电能力相关指标分析了该地区配电网的薄弱环节和供电能力提升的制约因素,进而提出相应的改善措施,可为配电网的优化规划提供有效参考。
By analysis of influencing factors of total supply capability of distribution network, a total supply capability calculation model combining power supply capability of substation with the capacity of the network transfer is established. The total power supply capability of regional distribution system is calculated, and the weak link of distribution network in this area and the restriction factors of power supply capability are analyzed by means of the relevant indexes of the total supply capability. The corresponding improvements are also put forward to provide effective reference for the optimal planning of distribution network.
关键词(KeyWords):
最大供电能力;配电网;线性规划法;薄弱环节
total supply capability;distribution system;linear programming;weak links
基金项目(Foundation): 国网浙江省电力有限公司宁波供电公司科技项目(SGZJNB00DKJS1701126)
作者(Author):
王波,何宇,张志雄,张兴
WANG Bo,HE Yu,ZHANG Zhixiong,ZHANG Xing
DOI: 10.19585/j.zjdl.201807013
参考文献(References):
- [1]王成山,罗凤章,肖峻,等.基于主变互联关系的配电系统供电能力计算方法[J].中国电机工程学报,2009,29(13):86-91.
- [2]肖峻,谷文卓,郭晓丹,等.配电系统供电能力模型[J].电力系统自动化,2011,35(24):47-52.
- [3]葛少云,韩俊,刘洪,等.计及主变过载及联络容量约束的配电系统供电能力计算方法[J].中国电机工程学报,2011,31(25):97-103.
- [4]刘洪,郭寅昌,葛少云,等.配电系统供电能力的修正算法[J].电网技术,2012,36(3):217-222.
- [5]欧阳武,程浩忠,张秀彬,等.城市中压配电网最大供电能力评估方法[J].高电压技术,2009,35(2):403-407.
- [6]刘耀锋,吴宁,印吉景.220 k V全户内变电站设计相关问题探讨[J].电力自动化设备,2010,30(12):124-125.
- [7]肖峻,贡晓旭,王成山.配电网最大供电能力与N-1安全校验的对比验证[J].电力系统自动化,2012,36(18):86-91.
- [8]陈雪,黄伟,叶琳浩,等.基于多源数据的配电网规划辅助决策系统研究[J].广东电力,2017,30(1):53-58.
- [9]郭林,李杰.面向提高供电能力的中压配电网架精细化规划方法[J].电网与清洁能源,2018,34(1):8-14.
- [10]吴哲慧,王光增,钟伟,等.配电网发展与投资决策动态评估方法[J].广东电力,2017,30(4):10-14.