浙江电力

2011, v.30;No.178(02) 42-45

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

600MW超临界机组直流炉给水处理方式探讨
Discussion on Feedwater Treatment for Once-through Boiler of 600 MW Supercritical Units

楼新明,刘舟平,关玉芳
LOU Xin-ming,LIU Zhou-ping,GUAN Yu-fang(Zheneng Lanxi Power Generation Co.

摘要(Abstract):

介绍兰溪发电有限责任公司4号机600MW超临界机组由给水全挥发性处理工艺转换为加氧处理工艺的试验过程,及水汽指标的变化情况和原因,对比了3种给水处理工艺的水汽质量,对实施加氧后的现象进行了分析。
This paper introduces the test process of conversion from all-volatile treatment to oxygenation treatment of feedwater,the variations of steam-water indexes as well as the causes in feedwater treatment for No.4 600 MW supercritical unit in Lanxi Power Generation Co.,Ltd,and analyzes the phenomena after oxygenation by comparison of steam-water quality for three treatment technologies.

关键词(KeyWords): 超临界机组;给水处理;加氧处理
supercritical unit;feedwater treatment;oxygenation treatment

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 楼新明,刘舟平,关玉芳
LOU Xin-ming,LIU Zhou-ping,GUAN Yu-fang(Zheneng Lanxi Power Generation Co.

DOI: 10.19585/j.zjdl.2011.02.013

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享