宁海电厂一、二期共用停机备用变出现的问题及应对措施Analysis and Disposal of the Existing Problems in the Sharing Spare Transformer for Halt by Ninghai First and Second Power Plants
罗保顺
LUO Bao-shun(Zhejiang Guohua Ninghai Power Plant
摘要(Abstract):
针对宁海电厂一、二期共用停机备用变的特殊接线方式,分析在二期基建调试和投产后不同阶段对一、二期厂用电运行方式的影响,提出解决办法和应对措施,以资借鉴。
Ninghai first and second Power Plants share the same spare transformer for halt.Based on this special connection,the influence to method of operation of generating auxiliary power in two different stages of capital construction and in service was analyzed and the measures of how to tackle the existing problems were also present in the paper.
关键词(KeyWords):
停机备用变;厂用电;影响;措施
spare transformer for halt;generating auxiliary power;influence;measures