为更好地优化火力发电厂的土建结构,针对火力发电厂土建结构的特点,根据全寿命整体优化设计概念,提出"功能合理、荷载取准,充分发挥材料强度"的优化原则,力求实现最优设防荷载下的最小结构造价。对火力发电厂的主厂房区域、输煤系统、干灰库、综合管架和灌注桩选型等进行了概念和体系优化分析。结果表明:采用C40混凝土灌注桩,节约全厂桩基费用33%;综合管架采用横向钢筋混凝土纵向钢拉杆结构,与传统纵向钢梁结构相比节约钢材20%;干灰库分析了传统结构、预应力结构和储灰层钢板结构,从节约材料的角度钢板结构最优,从节约投资角度,传统结构最优;输煤栈桥采用下沉式三角钢管桁架,与传统桁架相比,节约钢材20%;对碎煤机室的隔振台座布置进行了革新,新的结构形式的主体结构受理合理,且更加经济。
In order for better optimization of civil construction of power plant, the paper proposes an optimization principle of "reasonable functions, accurate load and full exertion of material strength" in accordance with whole life span optimization design concept and civil construction features of thermal power plant to achieve minimum construction cost under the condition of optimal precautionary load. The conceptual optimization analysis on the main building, coal handling system, dry ash storage, integrated pipe rack and caisson pile selection is conducted. It is pointed out that C40 concrete pile is adopted to save the cost of pile foundation of the whole plant by 33%. composite pipe rack adopts a transverse reinforced concrete longitudinal steel rod structure, which saves 20% of the steel compared with the traditional longitudinal steel beam structure. The dry ash storage has analyzed the traditional structure, prestressed structure and ash storage layer steel plate structure, in which the steel plate structure is the best in material saving, and the traditional structure is the best in cost saving. The coal conveying trestle adopts a sinking triangular steel tube truss,which saves 20% of the steel compared with the traditional trusses. The layout of the vibration isolation pedestal of the coal crushing machine room has been innovating. The main structure of the new structural form is reasonable and more economical.
关键词(KeyWords):
发电厂;土建结构;工程系统全局优化
power plant;civil construction structure;global optimization of engineering system
基金项目(Foundation):
作者(Author):
王学民
WANG Xuemin
DOI: 10.19585/j.zjdl.201809019
参考文献(References):
- [1]王光远.工程结构与系统抗震优化设计的实用方法[M].北京:中国建筑工业出版社,1999.
- [2]王学民,方伟定,方鸿强,等.基于性能的烟囱抗震设计[J].工业建筑,2007,37(S1):347-350.
- [3]王智磊,祝建,何江飞.复杂工况下发电厂钢煤斗不锈钢内衬的设计分析[J].浙江电力,2017,36(3):46-50.
- [4]建筑结构荷载规范:GB 50009-2001[S].北京:中国建筑工业出版社,2002.
- [5]方伟定,童建国,王学民,等.发电厂主厂房超长结构温度效应的弹塑性分析[J].电力建设,2010,31(7):1-4.
- [6]建筑桩基技术规范:JGJ 94-2008[S].北京:中国建筑工业出版社,2008.
- [7]建筑地基基础设计规范:GB 50007-2011[S].北京:中国建筑工业出版社,2012.
- [8]刘金砺,高文生,邱明兵.建筑桩基技术规范应用手册[M].1版.北京:中国建筑工业出版社,2010.
- [9]汤卫华,瞿岳前,王学民.附属栈桥通廊抗震性能分析[J].山西建筑,2009,35(36):69-70.
- [10]陈波,张文潇,白银,等.混凝土强度对盐渍土地区钻孔灌注桩耐久性的影响[J].水电能源科学,2016,34(6):165-168.
- [11]姜柏卿,曾宪江,丁建彤,等.寿光电厂钻孔灌注桩混凝土防盐卤水腐蚀试验研究[J].混凝土,2011,36(1):124-127.
- [12]吏林山.武汉青山长江公路大桥19号主墩钻孔桩施工技术[J].桥梁建设,2016,46(3):6-10.
- [13]吴兰英,方伟定,钟金周.桩基数量对燃机基座动力性能影响的对比分析[J].浙江电力,2013,32(4):68-72.
- [14]林同炎,S D斯多台斯伯利.结构概念和体系[M].北京:中国建筑工业出版社,2000.
- [15]李达,尹福生.输煤栈桥结构优化设计及连续钢桁架技术的应用[J].武汉大学学报(工学版),2010,43(S1):105-109.
- [16]谢健中,张磊,陈琪.H型钢无节点板钢桁架在北京现代汽车工程中的应用[J].工业建筑,2006,36(6):1-2.
- [17]张兆茂.H型钢无节点板桁架在工业建筑中的应用实例[J].四川建筑,2007,27(2):142-147.
- [18]李琪,方伟定,王学民,等.主厂房温度作用分析研究[J].武汉大学学报(工学版),2010,43(8):13-17.
- [19]王学民,李琪,方伟定,等.栈桥通廊风荷载取值探讨[J].特种结构,2007,24(4):70-73.
- [20]李久林,杨俊锋,杨庆德,等.国家体育场(鸟巢)工程施工新技术综述[J].建筑技术,2008,39(8):564-575.
- [21]王庭华,黄峥,丁静鹄,等.220 k V户内变电站屋顶构架结构体系及其抗震性能[J].电力工程技术,2017,36(5):76-80.