多条件约束下电网建设项目全过程闭环管控对策研究
Study on Countermeasures for Closed Loop Management and Control in the Overall Process of Power Grid Construction Projects with Multi-constraints

袁建国,王光增,黄健,赵冠军
YUAN Jianguo,WANG Guangzeng,HUANG Jian,ZHAO Guanjun

摘要(Abstract):

电网建设项目具有投资大、工期长的特点,受制于多重约束条件。研究并提出了多约束条件下电网建设各环节的合理工期,对国网金华供电公司近几年重要的电网建设项目进行了分析,研究了影响电网建设项目工期的关键因素,提出了多条件约束下电网建设项目全过程闭环管控对策。
Power grid construction projects are featured with large investment, long period and multi-constraints. This paper investigates and presents reasonable limit of every segment of power grid construction projects with multi-constraints and analyzes important power grid construction projects of Jinhua Power Supply Company in recent years; it studies key factors influencing duration of power grid construction projects. Finally, overall process management and control countermeasures for power grid construction projects with multi-constraints are proposed.

关键词(KeyWords): 电网建设;闭环管控;对策;多条件约束;全过程管理
power grid construction;closed loop management and control;countermeasures;multi-con-straints;overall process management

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 袁建国,王光增,黄健,赵冠军
YUAN Jianguo,WANG Guangzeng,HUANG Jian,ZHAO Guanjun

DOI: 10.19585/j.zjdl.2014.06.016

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享