浙江电力

2010, v.29;No.172(08) 28-30

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

135MW机组封存保养实践
Practices of Sealing and Maintenance of 135 MW Unit

肖修林,钱洲亥,黄光法,金士政
XIAO Xiu-lin1, QIAN Zhou-hai1, HUANG Guang-fa2, JIN Shi-zheng2 (1. Zhejiang Electric Power Test and Research Institute

摘要(Abstract):

对135MW机组进行封存保养的情况目前比较少见,随着我国火电机组装机容量的不断增加,将有越来越多更大容量的机组进入封存保养或检修保养状态。通过总结135MW机组的封存保养实践经验,认为对锅炉采用气相缓蚀剂法、对汽机采用干风干燥法能起到较好的封存保养效果。
Sealing and maintenance of 135 MW unit is rare at present. As the installed capacity of thermal power generating unit increases constantly in China, there will be an increasing number of units with larger capacity to be kept in sealing and maintenance or repair and maintenance. The methods of vapor phase corrosion inhibitor and dry-air blast are thought to be effective for boilers and steam turbines respectively based on the sealing and maintenance experience of 135 MW unit.

关键词(KeyWords): 封存保养;气相缓蚀剂;干风干燥法
sealing and maintenance; vapor phase corrosion inhibitor; dry air blast

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 肖修林,钱洲亥,黄光法,金士政
XIAO Xiu-lin1, QIAN Zhou-hai1, HUANG Guang-fa2, JIN Shi-zheng2 (1. Zhejiang Electric Power Test and Research Institute

DOI: 10.19585/j.zjdl.2010.08.009