浙江电力

2022, v.41;No.311(03) 80-86

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

基于经济技术分析的电压暂降治理方案选择
Selection of Voltage Sag Control Scheme Based on Economic and Technological Analysis

吴常春,吴宏坚,任国海,陈国柱
WU Changchun,WU Hongjian,REN Guohai,CHEN Guozhu

摘要(Abstract):

电压暂降是供电系统常见的一种现象,可能引起设备运转停止或故障,从而造成企业的经济损失。合理选择治理方案是一个技术与经济相结合的综合性问题。以国内某钢厂的电压暂降记录数据为基础,阐述了通过经济技术模型分析合理选择电压暂降治理方案的方法。该方法对于相关企业的电压暂降治理具有一定的指导意义。
As a common phenomenon in the power supply system,voltage sag may lead to equipment shutdown or even failure,resulting in economic losses of enterprises. It is a combination of technology and economy to select a reasonable control scheme. Based on the recorded data of voltage sag of a steel plant in China,this paper expounds on the method of choosing a reasonable treatment scheme through the analysis of the economic and technological model,which has guiding significance for the voltage sag control in enterprises concerned.

关键词(KeyWords): 电压暂降;经济技术模型;治理方案
voltage sag;economic and technological model;control scheme

Abstract:

Keywords:

基金项目(Foundation): 国网浙江遂昌县供电有限公司管理咨询项目(SGZJLSSCTKWT1800196)

作者(Author): 吴常春,吴宏坚,任国海,陈国柱
WU Changchun,WU Hongjian,REN Guohai,CHEN Guozhu

DOI: 10.19585/j.zjdl.202203010

参考文献(References):

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享