±800kV金华换流站换流变压器现场局部放电试验
On-site Partial Discharge Test of Converter Transformer in ±800 kV Jinhua Converter Station

杨智,谷小博,李晨
YANG Zhi,GU Xiaobo,LI Chen

摘要(Abstract):

溪洛渡左岸-浙江金华±800 kV特高压直流输电工程是国家电网公司第二个"±800 kV,800万kW"特高压直流输电工程,金华换流站是浙江省内第一个特高压直流换流站,其中换流变压器的绝缘结构复杂,电压等级高,且局部放电试验现场情况复杂,要求采取很好的试验条件及抗干扰措施。介绍了金华换流站换流变压器局部放电试验依据及试验方法,总结了试验中出现的问题,为今后的换流变压器调试工作提供了经验。
±800kV Xiluodu left shore-Zhejiang Jinhua EHV DC transmission Project is the second "±800 kV and 8000 MW" EHV DC transmission project of SGCC. Jinhua station is the first EHV DC converter station in Zhejiang province. Complex insulation structure, high voltage class and complex environment of on-site partial discharge require good testing conditions and anti-interference measurement. This paper introduces basis and method of partial discharge test in Jinhua EHV DC converter transformer and summarizes the problem found in the test, providing experience for converter transformer commissioning in the future.

关键词(KeyWords): 换流变压器;局部放电;抗干扰;直流输电
converter transformer;partial discharge;anti-interference;DC transmission

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 杨智,谷小博,李晨
YANG Zhi,GU Xiaobo,LI Chen

DOI: 10.19585/j.zjdl.2015.06.003