浙江电力

2015, v.34;No.228(04) 1-6

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

电网项目后评价体系研究及应用
Research and Application on Power Grid Project Post-Evaluation System

杨如明,贾巍,马千里
YANG Ruming,JIA Wei,MA Qianli

摘要(Abstract):

基于逻辑框架法和层次分析法构建电网投资项目后评价体系,提出33项定量化的后评价指标。通过电网建设项目后评价来真实反映电网项目的技术性能和投资效益,从而提高电网建设决策和管理的科学性。以台州220 kV童燎输变电工程为例,验证了评价体系的有效性。
Based on logic framework approach and analytic hierarchy process, the post-evaluation system of power grid investment projects is established and 33 quantitative post-evaluation indexes are proposed. By power grid project post-evaluation, technical performance and investment returns of grid projects are reflected, and decision-making and management of grid construction can therefore be more scientific. 220 kV Tong Liao power transmission project is taken as an example to verify the validity of the post-evaluation system.

关键词(KeyWords): 项目后评价;过程评价;技术性能评价;持续性评价;投资效益比;影响评价
post-evaluation of the project;process evaluation;technical performance evaluation;continuance evaluation;benefit-cost ratio;impact evaluation

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 杨如明,贾巍,马千里
YANG Ruming,JIA Wei,MA Qianli

DOI: 10.19585/j.zjdl.2015.04.001

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享