300MW机组DCS的故障分析处理与预控
Fault Analysis,Treatment and Precontrol for Distributed Control System in 300 MW Units

徐文辉,林勇
XU Wen-hui,LIN Yong(Zhejiang Energy Wenzhou Power Co.

摘要(Abstract):

针对ABB SYMPHONY控制系统在温州发电厂300 MW机组投用以来出现的通信网络、电源系统等硬件故障进行了分析,提出相关的解决方案和处理措施,并在此基础上,就提高热工系统可靠性提出了相关建议。
Through the analysis on the hardware faults including communications network,power supply system etc that have occurred since ABB SYMPHONY control system was applied to 300 MW units in Wenzhou Power Plant,this paper proposes the solutions and treatment measures and makes suggestions on improving reliability of thermal engineering system.

关键词(KeyWords): 300MW机组;控制系统;故障;处理
300 MW units;control system;faults;treatment