110kV双回路直线塔兼作单T接塔的探讨Discussion on 110 kV Double-circuit Straight Tower Doubling as Single-circuit T-Connection Tower
王伟,潘少良,张文杰,曹建伟
WANG Wei,PAN Shaoliang,ZHANG Wenjie,CAO Jianwei
摘要(Abstract):
受地方政府规划制约,110 k V输电线路T接点在直线塔塔位处,直线塔要兼作T接塔使用。讨论并解决了跳线如何和悬垂串同步摆动问题,对一基直线塔建模,经校核计算能满足T接线路结构受力要求。施工完成直线塔处跳线搭接,实现直线塔作为T接塔使用,可大量缩短主线路停电时间,取得很好的社会经济效益。
With planning restrict of local government, the T-connection point of 110 kV transmission lines locates at straight tower, and the straight tower doubles as T-connection tower. The paper discusses and proposes the jumper synchronously swings with the suspension string. The single-foundation straight tower is modeled, which can meet the structure stress requirement of T-connection line through verification and calculation. During the construction, the connection of jumper wire at the straight tower is implemented, by which the straight tower doubles as T-connection tower, greatly reducing outage duration of main lines and achieving favorable social and economic benefit.
关键词(KeyWords):
输电线路;直线塔;T接;跳线
transmission line;straight tower;T-connection;jumper wire
基金项目(Foundation):
作者(Author):
王伟,潘少良,张文杰,曹建伟
WANG Wei,PAN Shaoliang,ZHANG Wenjie,CAO Jianwei
DOI: 10.19585/j.zjdl.2015.09.005