300MW联合循环机组变工况优化运行的可行性研究Feasibility Study of Off-design Performance Operation Optimizationin 300 MW Combined Cycle Unit
阎保康,丁乙崟,徐育斌,陈坚红,李立军
摘要(Abstract):
针对300MW(3×100MW)燃气—蒸汽联合循环机组变工况运行的经济性问题 ,提出了对其进行优化运行的可行性研究思路、策略、步骤、内容及其有关的技术要求。通过试验、分析、研究得出机组负荷的最优化组合 ,提出先进的控制策略并开发一套优化运行软件 ,对机组AGC的投入提供更全面的软、硬件支持 ,以实现灵活、可靠、高效地对机组变工况负荷进行最佳分配
Research strategy,content and procedure of operation improving on economization of variant condition operation of 3×100 MW gas steam combined cycle unit is made in this paper.An advanced control strategy is stated and the software on enhancement of operating performance will be developed by test,analysis and research.The AGC function will be supported better and the distribution of load will be more flexible,efficient and reliable.
关键词(KeyWords):
300MW联合循环;变工况;优化运行;可行性;研究
MW combined cycle;variant condition;enhancement of operating;possibility;research
基金项目(Foundation):
作者(Author):
阎保康,丁乙崟,徐育斌,陈坚红,李立军
DOI: 10.19585/j.zjdl.2002.05.001