降低超临界锅炉运行厂用电量的实践
Practice of Auxiliary Power Consumption Reduction for Operation of Supercritical Boiler

颜磷,王达峰
YAN Lin1,WANG Da-feng2(1.Xiaoshan Power Plant

摘要(Abstract):

通过制粉系统的一系列调整试验,主要是磨煤机一次风量、一次风压、风粉混合物温度调整等试验,解决了某600 MW超临界锅炉磨煤机一次风量测量不准、冷风门调节余量不足及底渣带煤等问题,并减少了锅炉运行的厂用电量,经济效益可观。
The problems of a 600 MW supercritical boiler such as inaccurate primary airflow measurement for coal mill,insufficient adjustment margin for cold air valve and coal in slag have been resolved after a range of adjustment tests for coal pulverizing system,which mainly involve adjustment of primary airflow,primary air pressure,air and pulverized coal mixture temperature etc.As a result,a great amount of auxiliary power consumption for boiler operation has been reduced and high economic benefit is achieved.

关键词(KeyWords): 锅炉;一次风;制粉系统;风量
boiler;primary air;coal pulverizing system;airflow

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 颜磷,王达峰
YAN Lin1,WANG Da-feng2(1.Xiaoshan Power Plant

DOI: 10.19585/j.zjdl.2012.03.011