浙江电力

2009, v.28;No.159(01) 48-50

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

利用DMS实现供电可靠率的预控与全过程管理
Pre-control and All Process Management of Reliability in Power Supply System by DMS

周敬嵩,徐惠强
ZHOU Jing-song, XU Hui-qiang(Huzhou Electric Power Bureau

摘要(Abstract):

针对目前国内供电可靠率的管理多数停留在事后控制的现状,介绍了利用配电管理系统(DMS)实现供电可靠率预控与全过程管理的思路,并以湖州电力局DMS项目为例,对供电可靠率的几种预控手段进行了说明,对全过程管理的概念和实现方法进行了阐述。
In view of existing situation that control is mostly after power-cut in power supply system. A train of thought on pre-control and all process management of reliability in power supply system by DMS is introduced. For example, there is a DMS project of Huzhou electric power bureau. Several pre-control means, concept and implementation methods of all process management are introduced.

关键词(KeyWords): 供电;可靠率;DMS;预控;全过程管理
power supply system;reliability; distribution management system;pre-control;all process management

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 周敬嵩,徐惠强
ZHOU Jing-song, XU Hui-qiang(Huzhou Electric Power Bureau

DOI: 10.19585/j.zjdl.2009.01.014

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享