摘要(Abstract):

智能变电站的扩建接口在国内外都缺乏成熟经验,以220 k V塘雅变110 k V塘石1213、塘泄1214线间隔扩建工程为例,对智能变电站扩建过程中不同二次设备接口的要点进行分析总结,为智能变电站的扩建接口提供了参考。
The expansion interface of intelligent substation lacks mature experience both at home and abroad.Taking the interval expansion project of 110 kV Tangshi 1213 line and Tangxie 1214 line of 220 kV Tangya substation for example, the paper analyzes and summarizes main points of secondary equipment interfaces during the expansion process in intelligent substation, providing a reference for interface extension of intelligent substations.

关键词(KeyWords): 智能变电站;扩建接口;二次设备
intelligent substation;expansion interface;secondary equipment

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 张伟,吴雪峰,杜悠然
ZHANG Wei,WU Xuefeng,DU Youran

DOI: 10.19585/j.zjdl.2016.07.005