摘要(Abstract):
AGC(自动发电控制)机组的调配是辅助服务中的一项重要内容。由于AGC服务与有功电力之间具有较强的耦合性,节能发电调度下如何协调AGC和有功电力是一个值得研究的问题。利用层次分析法对AGC机组的各方面要素进行量化,并通过算例与发电序位表对所提两种方案进行对比分析,为节能发电调度模式下AGC机组的调配提供参考。
AGC(automatic generation control) unit dispatch is one of the important contents of the power system auxiliary service. Due to the strong coupling between AGC service and active power, it is necessary to study how to coordinate the relationship between AGC service and active power in the energy-saving power generation dispatch mode. Based on the analytic hierarchy process, this paper quantitatively analyzes all aspects of the AGC unit and proposes the AGC unit dispatch method. The comparison between the proposed method and the traditional power generation sequence table is analyzed by a numerical example, which provides a reference for the AGC units dispatch in the energy-saving power generation dispatch mode.
关键词(KeyWords):
节能发电调度;AGC;层次分析法;负荷备用
energy-saving generation dispatching;AGC;analytic hierarchy process;load reserve
基金项目(Foundation): 国家自然科学基金青年科学基金项目(61503197)
作者(Author):
周永灿,吴英俊
ZHOU Yongcan,WU Yingjun
DOI: 10.19585/j.zjdl.201905016
参考文献(References):
- [1]陈亮,王程,魏韡,等.广东电网节能发电调度模型与应用[J].中国电力,2013,46(6):38-43.
- [2]管益斌,王岗,赵翠宇,等.江苏电网节能发电调度分析与对策[J].中国电力,2011,44(9):4-9.
- [3]李川.基于节能发电调度的减少水电旋转备用的研究[J].电力科学与工程,2013,29(1):32-37.
- [4]梅坚,杨立兵,李晓刚,等.调峰市场效用分析与低谷调峰市场设计[J].电力系统自动化,2013,37(21):134-138.
- [5]张粒子,王睿,金允剑,等.基于跨省发电权交易的“疆电外送”交易模式研究[J].电力系统保护与控制,2012,40(5):69-79.
- [6]范杰,杨立兵,李晓刚,等.基于智能代理模型的跨省集中交易平台仿真分析[J].电力系统自动化,2013,37(9):60-65.
- [7]邹斌,赵妍,李晓刚,等.跨省跨区清洁能源消纳补偿的市场机制研究[J].电网技术,2016,40(2):595-601.
- [8]方印,张显,孙乔,等.适应清洁能源消纳的电力市场运营态势指标体系[J].中国电力,2014,47(5):145-149.
- [9]TALAQ J H,El-HAWARY F,EL-HAWARY M E.Asummary of environmental economic dispatch algorithms[J].IEEE Transactions on Power Systems,1994,9(3):1508-1516.
- [10]KING T D,EL-HAWARY M E,EL-HAWARY F.Optimal environmental dispatching of electric power systems via an improved Hopfield neural network model[J].IEEETransactions on Power Systems,1995,10(3):1559-3565.
- [11]LU B,SHAHIDEHPOUR M.Unit commitment with flexible generating units[J].IEEE Transactions on Power Systems,2005,20(2):1022-1034.
- [12]CHOI J,JEONG S,SHI B,et al.CO2,SOXand NOXemis sions constrained multi-criteria-best generation mix using fuzzy set theory[C].Power Engineering,2007 Large Engineering Systems Conference on Montreal,Quebec,Canada,2007.
- [13]刘盛松,邰能灵,侯志俭,等.基于最优潮流与模糊贴近度的电力系统环境保护研究[J].中国电机工程学报,2003,23(4):21-26.
- [14]黎灿兵,吕素,曹一家,等.面向节能发电调度的日前机组组合优化方法[J].中国电机工程学报,2012,32(16):70-76.
- [15]程鑫,卢洵,樊扬,等.广东调峰电源调用序位研究[J].广东电力,2018,31(5):56-63.
- [16]仇进,吴继平,滕贤亮,等.调频辅助服务市场环境下频率控制技术研究[J].电力工程技术,2018,37(2):1-7.
- [17]姚建村,梅兰,徐樾,等.基于CPS标准的火电机组AGC模糊优化控制策略[J].广东电力,2017,30(6):11-16.
- [18]徐敏,陈亦平,涂亮,等.异步联网后AGC超调引起频率波动的问题分析[J].广东电力,2017,30(5):81-86.
- [19]徐春雷,徐瑞,仇晨光,等.发电机组一次调频在线测试与AGC性能考核系统设计[J].电力工程技术,2017,36(3):1-6.