变电站所用电系统的2种优化方案Two Optimization Schemes for Auxiliary Power Supply System of Substation
周杰,陈植,李勇,易永利
ZHOU Jie,CHEN Zhi,LI Yong,YI Yongli
摘要(Abstract):
为了提高变电站所用电供电可靠性、连续性,基于目前变电站所用电主接线和运行方式,分别针对重要负荷和所用电电源侧,提出了2种所用电系统的优化方案。2种优化方案提升了变电站所用电的自动化和智能化水平,为目前变电站所用电改造或者未来的设计和建造提供了可行的借鉴方案。
In order to improve the reliability and continuity of auxiliary power supply of substation,the paper proposes two optimization schemes for key loads and power side based on main connection and operation modes currently adopted in substations. It is practically proved that the two optimization schemes enable auxiliary power supply of substation to be more automated and intelligent,providing feasible scheme for transformation of auxiliary power supply for substation or its design and construction in the future.
关键词(KeyWords):
变电站;所用电;优化方案;ATSE
substation;auxiliary power of substation;optimization scheme;ATSE(automatic transfer switching equipment)
基金项目(Foundation):
作者(Author):
周杰,陈植,李勇,易永利
ZHOU Jie,CHEN Zhi,LI Yong,YI Yongli
DOI: 10.19585/j.zjdl.2016.02.004
参考文献(References):
- [1]DL/T 5155-2002 220~500 k V变电所所用电设计技术规程[S].北京:中国电力出版社,2002.
- [2]倪琳娜.关于变电站所用电若干问题的探讨[J].中国电力教育,2012(3):148-149.
- [3]高军彦,臧彦洪.变电站380 V端子箱环路接线比较分析与改进[J].天津电力技术,2012(2):36-37.
- [4]王福泉.220 k V变电站站用电系统的设计优化[J].机电信息,2014(30):129-130.
- [5]蔡志远,陈朝辉,王新伟.自动转换开关电器的发展与应用[J].低压电器,2011(22):11-15.
- [6]张骋,陈小青.自动转换开关电器应用常见问题探讨[J].低压电器,2010(10):60-62.
- [7]曾秀英.双电源自动切换开关(ATS)在站用电系统中的应用分析[J].企业科技与发展,2010(16):67-69.
- [8]张佳,董家读,张雪,等.双电源自动切换装置在500 k V东坡变电站站用电系统中的应用分析[J].电气开关,2014(5):81-85.