某联合循环机组甩负荷试验转速飞升过高原因分析Cause Analysis on Sharp Rotation Speed Increase in Load Rejection Test of a Combined Cycle Unit
丁智华,丁阳俊,顾正皓
DING Zhihua,DING Yangjun,GU Zhenghao
摘要(Abstract):
为研究燃气-蒸汽联合循环机组甩负荷过程,分析了某联合循环机组甩负荷过程中汽轮机高压调阀没有快关对此次甩负荷转速飞升的影响,并结合同类型机组甩负荷试验结果评估该机组甩100%额定负荷时的最高飞升转速,指出燃气-蒸汽联合循环机组甩负荷试验需要比汽轮发电机组甩负荷试验考虑更多因素。
Abstrat:In order to investigate load rejection process of gas-steam turbine combined cycle unit,the paper indicates that in load rejection high-pressure control valve can not close quickly and analyzes the effect on sharp rotation speed increase;furthermore,it estimates the maximum rotation speed with rated load rejection of 100%based on the same type of load rejection test,and demonstrates that more factors should be taken into consideration in load rejection test of gas-steam turbine combined cycle unit compared with that of steam turbine generating unit.
关键词(KeyWords):
燃气-蒸汽联合循环;甩负荷试验;高压调阀;转速
gas-steam turbine combined cycle unit;load rejection test;high-pressure control valve;rotation speed
基金项目(Foundation): 浙江省电力有限公司科技项目(5211DS16002B)
作者(Author):
丁智华,丁阳俊,顾正皓
DING Zhihua,DING Yangjun,GU Zhenghao
DOI: 10.19585/j.zjdl.201806019
参考文献(References):
- [1]火力发电建设工程机组甩负荷试验导则:DL/T 1270-2013[S].北京:中国电力出版社,2014.
- [2]李树田.国内大型燃气轮机发展历程及运行综述[J].浙江电力,2012,31(12):75-78.
- [3]苏烨,樊印龙,尹峰,等.联合循环燃气轮机低负荷运行模式探讨与分析[J].浙江电力,2014,33(12):35-37.
- [4]梁青,刘世鑫,周亮.9E燃气轮机黑启动方案及实战[J].燃气轮机技术,2018,31(1):46-50.
- [5]王异成,张宝,丁阳俊,等.600 MW机组甩负荷试验时转速飞升过高原因分析[J].浙江电力,2015,34(9):46-49.
- [6]吴凡.S109FA联合循环机组汽轮机甩负荷原因分析[J].华电技术,2010,32(9):59-62.
- [7]沈利萍,顾正皓,丁勇能.基于MARK VIe控制系统的燃料气系统参数辨识[J].浙江电力,2015,34(10):33-36.
- [8]顾正皓,张宝,光旭,等.回热抽汽管道容积对汽轮机甩负荷时转速飞升的影响[J].浙江电力,2017,36(5):34-37.
- [9]汽轮机调节控制系统试验导则:DL/T 711-1999[S].北京:中国电力出版社,2000.
- [10]张杨林子,刘双白,庞春凤,等.联合循环机组建模及环境参数对其性能的影响[J].电力科学与工程,2016,32(6):68-72.
- [11]孙衍锋,姚挺生.压气机进气温度对联合循环机组性能影响的探讨[J].燃气轮机技术,2017,30(1):53-56.
- [12]王曙光,朱本刚.GE公司9E燃气轮机进气加热系统控制分析[J].燃气轮机技术,2017,30(4):47-50.
- [13]燕金栋,姜建.M701F型联合循环机组采用进气喷雾冷却技术的探讨[J].发电设备,2010(3):210-212.