脱硫系统取消旁路烟道后的问题及应对措施
Problems of Bypass Flue Removed Desulphurization System and the Countermeasures

胡松如,金东春,陈彪
HU Song-ru1,JIN Dong-chun2,CHEN Biao2(1.Zhejiang Provincial Energy Group Co.

摘要(Abstract):

分析了火力发电机组取消旁路烟道的技术可行性和安全性,讨论了旁路烟道取消后给机组及脱硫系统带来的一系列技术问题,结合现有无旁路脱硫系统的运行实践,对取消旁路后出现的问题,从设备改造、运行调整等方面提出了应对措施。
The paper analyzes technical feasibility and safety of removing bypass flue from thermal generator sets and it discusses technical problems brought to units and desulphurization system due to the removal of bypass flue.In combination with practical operation of current non-bypass desulphurization system,the paper proposes countermeasure against problems due to removal of bypass in terms of equipment transformation,operation adjustment and so forth.

关键词(KeyWords): 发电厂;脱硫;烟道旁路;取消
power plant;desulphurization;bypass flue;removal

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 胡松如,金东春,陈彪
HU Song-ru1,JIN Dong-chun2,CHEN Biao2(1.Zhejiang Provincial Energy Group Co.

DOI: 10.19585/j.zjdl.2012.11.021

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享