1000MW发电机组热控调试中存在的主要问题及对策
Problems and Countermeasures for Thermal Control System Debugging in 1000 MW Ultra-supercritical Unit

贺贤峰,丁俊宏,陈小强,王函弘
HE Xian-feng1,DING Jun-hong2,CHEN Xiao-qiang2,WANG Han-hong2(1.Guodian Zhejiang Beilun NO.1 Power Generation Co.Ltd.

摘要(Abstract):

通过对国电北仑电厂三期工程(2×1000MW)超超临界机组热控调试,对机组DCS、DEH、主辅机TSI、联锁保护、协调控制等存在的问题进行分析,并逐一提出了应对措施,进一步提高了机组的自动化水平,确保了机组的安全运行。
The paper analyses problems and countermeasures for thermal control system debugging in ultra-supercritical unit of third-phase project in Guodian Beilun power plant,which mainly includes Distributed Control System,DEH,Main & Assit Machine TSI,Interlock Protect system,automatic control system and so on. It can provide some references for power plant control system debugging.

关键词(KeyWords): 超超临界机组;热控;调试;问题;对策
ultra supercritical unit;control system;debugging;problem;countermeasure

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 贺贤峰,丁俊宏,陈小强,王函弘
HE Xian-feng1,DING Jun-hong2,CHEN Xiao-qiang2,WANG Han-hong2(1.Guodian Zhejiang Beilun NO.1 Power Generation Co.Ltd.

DOI: 10.19585/j.zjdl.2009.05.006

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享