运行变电站高层软母线更换施工技术研究
Research on Construction Technology of High-level Flexible Conductor Replacement at Operating Substation

赵水忠,徐重力,单俊
ZHAO Shuizhong,XU Zhongli,SHAN Jun

摘要(Abstract):

以500kV瓯海变电站220kV 2号母联间隔为例,研究分析了采用1辆吊机加2套机动绞磨进行运行变电站高层软母线更换的施工方法,经现场安装实施证明,该施工方法安全、可靠、简便、经济,具有较高的推广应用价值。
Taking the 220 kV No.2 bus coupler interval in the 500 kV Ouhai substation as an example, the paper investigates and analyzes the method of high-level flexible conductor replacement by using one crane and two power-driven winches. This method is safe, reliable, simple and economical, and has high application value. It is proved by field installation that the method is safe, reliable, simple and economical, and has high application value.

关键词(KeyWords): 运行变电站;软母线更换;增容改造
operating substation;flexible conductor replacement;capacity increase transformation

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 赵水忠,徐重力,单俊
ZHAO Shuizhong,XU Zhongli,SHAN Jun

DOI: 10.19585/j.zjdl.2016.11.002