考虑电网拓扑动态变化的电力现货市场长周期仿真方法Long-term electricity spot market simulation method considering dynamic changes in grid topology
徐程炜,周天皓,周子青,杨滢,魏炜,王业舟
XU Chengwei,ZHOU Tianhao,ZHOU Ziqing,YANG Ying,WEI Wei,WANG Yezhou
摘要(Abstract):
电网检修、运行方式调整、设备投运等因素会造成电力现货市场长周期仿真过程中电网拓扑动态变化,若网架每次发生变动均重新搭建完整电网模型,将显著降低长周期仿真运算效率。为此,基于3种典型场景下的转移因子快速修正方法,提出以广义支路闭合为基本操作单元的统一表征框架,建立通用的广义支路闭合表征模型,将原本需要分别处理的多种复杂拓扑变化场景等效转化为单一支路闭合操作的组合;在此基础上,构建计及电网拓扑动态变化的长周期仿真流程,实现拓扑时变特性与长时间尺度市场仿真的深度融合。算例分析结果表明,所提方法在不同规模电网及不同拓扑变化幅度下均具备高效稳定的计算性能,且电网规模越大其效率优势越明显。
Grid maintenance, operating mode adjustments, and equipment commissioning may lead to dynamic changes in grid topology during long-term electricity spot market simulations. Rebuilding a complete power grid model whenever the grid topology changes significantly reduces the computational efficiency of long-term market simulations. To address this issue, this paper proposes a unified representation framework based on fast shift factor updating methods for three typical scenarios, with generalized branch closing serving as the basic operational unit. A generalized branch closing representation model is established to equivalently transform various complex topologychange scenarios that would otherwise require separate treatment into combinations of single branch-closing operations. On this basis, a long-term simulation workflow considering dynamic changes in grid topology is developed, enabling effective integration of time-varying topological characteristics with long-timescale market simulation. Numerical case studies demonstrate that the proposed method delivers efficient and stable computational performance across power grids of different scales and under different extents of topology change. Moreover, its computational efficiency advantage becomes increasingly pronounced as the grid scale increases.
关键词(KeyWords):
电力现货市场;长周期仿真;电网动态演化;转移因子;广义支路闭合
electricity spot market;long-term simulation;dynamic changes in grid topology;shift factor;generalized branch closing
基金项目(Foundation): 天津市自然科学基金(52277119)
作者(Author):
徐程炜,周天皓,周子青,杨滢,魏炜,王业舟
XU Chengwei,ZHOU Tianhao,ZHOU Ziqing,YANG Ying,WEI Wei,WANG Yezhou
DOI: 10.19585/j.zjdl.202608003
参考文献(References):
- [1]孙怡文,邢海军,梅丘梅,等.计及风电-光伏出力相关性的新型电力系统可靠性评估[J].浙江电力,2025,44(9):13-20.Sun Yiwen,Xing Haijun,Mei Qiumei,et al.Reliability assessment of modern power systems accounting for the correlation of wind-PV output correlation[J].Zhejiang Electric Power,2025,44(9):13-20.
- [2]何英静,王湘,但扬清,等.考虑源荷不确定性的风光水蓄互补系统优化调度策略[J].浙江电力,2025,44(4):103-111.He Yingjing,Wang Xiang,Dan Yangqing,et al.An optimal scheduling strategy for a wind-solar-hydropowerpumped storage complementary system considering source-load uncertainty[J].Zhejiang Electric Power,2025,44(4):103-111.
- [3]傅铮,王峰,王若宇,等.基于时序生产模拟的需求侧响应促进新能源消纳量化分析[J].浙江电力,2024,43(9):39-48.Fu Zheng,Wang Feng,Wang Ruoyu,et al. Quantitative analysis of demand-side response for improving renewable energy accommodation based on chronological production simulation[J]. Zhejiang Electric Power,2024,43(9):39-48.
- [4]魏利屾,艾小猛,方家琨,等.面向新型电力系统的时序生产模拟应用与求解技术综述[J].电力系统自动化,2024,48(6):170-184.Wei Lishen,Ai Xiaomeng,Fang Jiakun,et al.Review on applications and solving techniques of time-series production simulation for new power system[J]. Automation of Electric Power Systems,2024,48(6):170-184.
- [5]Palmintier B S,Webster M D.Heterogeneous unit clustering for efficient operational flexibility modeling[J]. IEEE Transactions on Power Systems,2013,29(3):1089-1098.
- [6]韩冰,舒隽,孙浩男.基于集群机组组合的区域电力系统生产模拟仿真[J].现代电力,2020,37(5):478-483.Han Bing,Shu Jun,Sun Haonan.Regional power system production simulation based on clustered unit commitment[J].Modern Electric Power,2020,37(5):478-483.
- [7]Morales-Espana G,Tejada-Arango D A.Modeling the hidden flexibility of clustered unit commitment[J]. IEEE Transactions on Power Systems,2019,34(4):3294-3296.
- [8]Zhang Biyuan,Ding Tao,Xiao Yang.A tight unit aggregation for unit commitment to eliminate symmetry[J].IEEE Transactions on Power Systems,2025,40(6):5264-5275.
- [9]Yin Yue,He Chuan,Liu Tianqi,et al.Risk-averse stochastic midterm scheduling of thermal-hydro-wind system:a network-constrained clustered unit commitment approach[J]. IEEE Transactions on Sustainable Energy,2022,13(3):1293-1304.
- [10]Kibaek K,Audun B,Feng Q.Temporal decomposition for improved unit commitment in power system production cost modeling[J].IEEE Transactions on Power Systems,2018,33(5):5276-5287.
- [11]Liao Shiwu,Yao Wei,Han Xingning,et al.Chronological operation simulation framework for regional power system under high penetration of renewable energy using meteorological data[J].Applied Energy,2017,203:816-828.
- [12]Yuan Wei,Zhai Qiaozhu,Li Pai,et al. Fast solution method for TCUC with long time horizon based on horizon splitting[J].International Journal of Electrical Power&Energy Systems,2019,112:61-69.
- [13]Chen Youxin,Zhang Kuan,Liu Nian.A hybrid time scale production simulation method for electricity-hydrogen integrated energy systems[J].IEEE Transactions on Sustainable Energy,2026,17(2):1452-1469.
- [14]Teichgraeber H,Brandt A R.Time-series aggregation for the optimization of energy systems:goals,challenges,approaches,and opportunities[J]. Renewable and Sustainable Energy Reviews,2022,157:111984.
- [15]Pineda S,Fernández-Blanco R,Morales J M. Timeadaptive unit commitment[J]. IEEE Transactions on Power Systems,2019,34(5):3869-3878.
- [16]Feng Chenjia,Shao Chengcheng,Wang Xifan.Load state transition curve based unit commitment for production cost modeling with wind power[J].IEEE Transactions on Sustainable Energy,2021,12(3):1718-1729.
- [17]Teichgraeber H,Brandt A R. Clustering methods to find representative periods for the optimization of energy systems:An initial framework and comparison[J].Applied energy,2019,239:1283-1293.
- [18]Yan Jiahua,Li Yaping,Yao Jianguo,et al.Look-ahead unit commitment with adaptive horizon based on deep reinforcement learning[J].IEEE Transactions on Power Systems,2023,39(2),3673-3684.
- [19]Guo Jiachun,Fu Yong,Li Zuyi,et al.Direct calculation of line outage distribution factors[J].IEEE Transactions on Power Systems,2009,24(3):1633-1634.
- [20]Van Dijk J,Westerbeck N,Schewe L,et al.Unified algebraic deviation of distribution factors in linear power flow[J].arXiv preprint arXiv:2412.16164,2024.
- [21]Westerbeck N,Van Dijk J,Viebahn J,et al. Accelerated DC loadflow solver for topology optimization[C]//Proceedings of the 2025 IEEE PowerTech Conference.Kiel,Germany:Institute of Electrical and Electronics Engineers,2025:1-8.
- [22]孙国强,左岩,黄蔓云,等.基于半端到端的预测-决策一体化最优线路开断调度方法[J].浙江电力,2025,44(10):81-90.Sun Guoqiang,Zuo Yan,Huang Manyun,et al. A semiend-to-end integrated prediction and decision-making approach for optimal transmission line switching scheduling[J].Zhejiang Electric Power,2025,44(10):81-90.
- 电力现货市场
- 长周期仿真
- 电网动态演化
- 转移因子
- 广义支路闭合
electricity spot market - long-term simulation
- dynamic changes in grid topology
- shift factor
- generalized branch closing