采用断路器首端投切方式治理35 kV并联电抗器操作过电压
Switching Overvoltage Control of 35 kV Shunt Reactor by Head End Switching of Breaker

金佳敏,郑一鸣,陈宜斌,万晓
JIN Jiamin,ZHENG Yiming,CHEN Yibin,WAN Xiao

摘要(Abstract):

断路器在开断35 kV并联电抗器过程中,会产生严重的操作过电压问题,严重威胁35 kV系统设备绝缘。研究表明,通过在并抗中性点末端加装断路器进行投切能有效治理开断过电压问题,但是中性点不具备分相引出条件的并抗不具备改造条件。针对以上治理困难,提出了在并抗首端安装110 kV电压等级SF_6断路器的治理措施,通过现场试验验证结果表明,采用首端110 kV断路器投切并抗能有效治理过电压问题。
In the process of 35 kV shunt reactor breaking,serious switching overvoltage is generated that threatens equipment insulation of 35 kV system.It can effectively handle switching overvoltage to install a breaker at the end of shunt neutral point.However,neutral points without leadouts can not be transformed.Therefore,the paper suggests installing 110 kV SF_6 circuit breaker at the head end of shunt reactor.The field test shows that head end switching of 110 kV breaker can effectively control overvoltage.

关键词(KeyWords): 并联电抗器;操作过电压;空母线;首端投切;过电压治理
shunt reactor;switching overvoltage;no-load busbar;head end switching;overvoltage control

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 金佳敏,郑一鸣,陈宜斌,万晓
JIN Jiamin,ZHENG Yiming,CHEN Yibin,WAN Xiao

DOI: 10.19585/j.zjdl.201710011