浙江电力

2011, v.30;No.181(05) 5-8

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

变压器现场局部放电试验有关问题的分析
Analysis on Problems of On-site Partial Discharge Tests of Power Transformers

谷小博
GU Xiao-bo(Zhejiang Electric Power Test and Research Institute

摘要(Abstract):

总结了近年来多台次变压器现场局部放电试验的情况,分析了试验时容性无功容量的估算方法,通过与实际容量的对比,验证了估算方法的可行性。同时通过实例,分析了现场试验中典型干扰的抑制排除方法,展望了变压器局部放电技术的发展趋势。
Through the analysis of the calculation method of capacitive reactive power in tests based on the summarization of the partial discharge tests of a great number of power transformers in recent years,the comparison with actual capacity is carried out and the feasibility of the calculation method is verified.Through the analysis of the elimination method of typical interference in field tests based on the cases,this paper points out the development trend of partial discharge technology of transformers.

关键词(KeyWords): 变压器;局部放电;补偿容量估算;干扰
transformer;partial discharge;compensative capacity calculation;interference

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 谷小博
GU Xiao-bo(Zhejiang Electric Power Test and Research Institute

DOI: 10.19585/j.zjdl.2011.05.002

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享