1000MW机组超超临界塔式锅炉调试
Commissioning of 1 000 MW Unit Ultra-supercritical Tower Boiler

徐小琼,潘国清
XU Xiao-qiong,PAN Guo-qing (Zhejiang Electric Power Test and Research Institute

摘要(Abstract):

结合1000MW超超临界塔式锅炉的调试情况,对锅炉调试的各个阶段、冷态通风试验、锅炉蒸汽吹管、制粉系统调整试验、锅炉整套启动过程进行了描述,对整套启动过程中出现的问题进行分析并提出了解决方法。
The commissioning of 1 000 MW unit coal fired ultra-supercritical tower boiler is introduced. The boiler cold air test and boiler steam blowing is described in detail. The problem which happened in the starting of the boiler is discussed.

关键词(KeyWords): 1000MW;超超临界;塔式锅炉;调试
1 000 MW; ultra-supercritical; tower boiler; commissioning