浙江电力

2012, v.31;No.196(08) 42-44+71

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

600MW级机组接入220kV分区电网的电气主接线方式探讨
Discussion on Modes of Main Electric Connection for 600 MW Units Connected to 220 kV District Grid

陈尚发
CHEN Shang-fa(Zhejiang Energy Changxing Power Generation Co.

摘要(Abstract):

以2×600 MW级机组为例,对各种接入220 kV分区电网的主接线方式进行分析和比较,探讨了1/2电气主接线方案,供有关各方参考。
This paper analyzes and compares various modes of main electric connection connected to 220 kV district grid based on 2× 600 MW units.In addition,it explores the 1/2 main connection scheme and can serve as a reference for relevant parties.

关键词(KeyWords): 600MW级机组;分区电网;电气主接线;短路电流
600 MW units;district grid;main electric connection;short-circuit current

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 陈尚发
CHEN Shang-fa(Zhejiang Energy Changxing Power Generation Co.

DOI: 10.19585/j.zjdl.2012.08.012

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享