浙江电力

2010, v.29;No.174(10) 54-56+60

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

浙江省发电厂烟气脱硫控制系统现状分析及完善
Analysis and Improvement of Current Situation of FGD Control System for Power Plants in Zhejiang Province

周佑,苏烨
ZHOU You,SU Ye(Zhejiang Electric Power Test & Research Institute

摘要(Abstract):

通过对目前浙江省发电厂采用湿法脱硫工艺的燃煤机组脱硫控制系统运行状况的调查,分析存在的问题,提出了优化方法与建议,为脱硫控制系统的进一步完善提供技术参考。
By means of investigating the running state of wet FGD(Flue Gas Desulfurization) control system for coal-fired generating units in power plants in Zhejiang Province,this paper analyzes the existing problems,proposes the optimization methods and suggestions and offers a reference for further improvement of FGD Control System.

关键词(KeyWords): 烟气脱硫;控制系统;现状分析;完善
flue gas desulfurization;control system;current situation analysis;improvement

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 周佑,苏烨
ZHOU You,SU Ye(Zhejiang Electric Power Test & Research Institute

DOI: 10.19585/j.zjdl.2010.10.015

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享