浙江电网降低高压输电线路雷击跳闸率的措施分析Analysis of Measures to Reduce Lightning Trip-out Rate of High-voltage Transmission Lines in Zhejiang Power Grid
金祖山,胡文堂,龚坚刚,吴明祥,曾嵘
JIN Zu-shan1,HU Wen-tang 1,GONG Jian-gang 2,Wu Ming-xiang 1,ZENG Rong 3(1.Zhejiang Electric Power Test and Research Institute
摘要(Abstract):
为增强浙江电网高压输电线路的防雷能力,已采取了各种防雷措施,如降低杆塔接地电阻、加强绝缘水平、安装线路避雷器和增加耦合地线等,计算分析采取这些措施对雷击(反击或绕击)跳闸率的影响,提出了高压线路防雷的总体建议。
In order to strengthen the lightning protection capability of high-voltage transmission lines in Zhe-jiang power grid,a variety of lightning measures are adopted,such as reducing tower ground resistance,improving insulation,installing line surge arrester and adding coupling ground wire etc.This paper calculates and analyzes the effect on the lightning trip-out(back striking and shielding failure) rate and puts forward the overall proposals of lightning protection for high-voltage transmission lines.
关键词(KeyWords):
高压线路;防雷;效果;分析;建议
high-voltage transmission line;lightning protection;effect;analysis;proposals
基金项目(Foundation):
作者(Author):
金祖山,胡文堂,龚坚刚,吴明祥,曾嵘
JIN Zu-shan1,HU Wen-tang 1,GONG Jian-gang 2,Wu Ming-xiang 1,ZENG Rong 3(1.Zhejiang Electric Power Test and Research Institute
DOI: 10.19585/j.zjdl.2010.11.001
参考文献(References):
- 浙江省电力公司,浙江省电力试验研究院,清华大学电机工程系.浙江省输电线路防雷设计评估系统及其应用研究[R].2009.
- 张纬钹,高玉明.电力系统过电压与绝缘配合[M].北京:清华大学出版社,1988.
- S M CHEN,Y DU,L M FAN,et al.Evaluation of theGuang Dong Lightning Location System with transmissionline fault data[J].IEE Proc-Sci Meas Technol,2002,149(1):9-16.
- 周东平.三峡电站500 kV同杆并架出线防雷研究[D].北京:清华大学电机工程系,1998.
- 钱冠军,王晓瑜,汪雁,等.输电线路雷击仿真模型[J].中国电机工程学报,1999,19(8):39-45.
- 金祖山
- 胡文堂
- 龚坚刚
- 吴明祥
- 曾嵘
JIN Zu-shan1 - HU Wen-tang 1
- GONG Jian-gang 2
- Wu Ming-xiang 1
- ZENG Rong 3(1.Zhejiang Electric Power Test and Research Institute
- 金祖山
- 胡文堂
- 龚坚刚
- 吴明祥
- 曾嵘
JIN Zu-shan1 - HU Wen-tang 1
- GONG Jian-gang 2
- Wu Ming-xiang 1
- ZENG Rong 3(1.Zhejiang Electric Power Test and Research Institute