巴基斯坦SAIF发电厂燃机小岛运行试验分析
Analysis on Gas Turbine Island Operation Test of Pakistan SAIF Power Plant

余小敏,王达蜂,王异臣
YU Xiao-min,WANG Da-feng,WANG Yi-chen(Zhejiang Electric Power Test and Research Institute

摘要(Abstract):

由于燃机具备启动快速的特点,故比较适合作为电网事故情况下黑启动电源,此时燃机能够运行在小岛模式显得尤为重要。介绍了巴基斯坦SAIF发电厂燃机小岛运行试验的情况,主要分析了GE公司燃机小岛运行逻辑的设计思想,并对试验的过程及试验过程中出现的问题及解决方法进行了总结。试验证明,GE公司的燃机具备比较优良的小岛运行能力。
Since gas turbines are featured by rapid start,these are suitable for black start power supply in grid accidents.It is significant for gas turbines to operate in island mode.This paper introduces the island operation test of the gas turbines in Pakistan SAIF Power Plant,analyzes the design of island operation logic of the gas turbines manufactured by GE Company and summarizes the test process and the problems found in the process as well as the solutions.The test proves that gas turbines manufactured by GE have a desirable capability of island operation.

关键词(KeyWords): 巴基斯坦;燃机;GE;小岛运行
Pakistan;gas turbine;GE;island operation

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 余小敏,王达蜂,王异臣
YU Xiao-min,WANG Da-feng,WANG Yi-chen(Zhejiang Electric Power Test and Research Institute

DOI: 10.19585/j.zjdl.2012.05.016