烟气脱硫废水排入渣水处理系统的试验研究
Experimental Study on Process of Discharging Wastewater from FGD System into Ash-sluicing System

陈彪,许超,赵琦,符岳全
CHEN Biao1,XU Chao2,ZHAO Qi1,FU Yue-quan3(1.Zhejiang Electric Power Test and Research Institute

摘要(Abstract):

介绍了目前湿法烟气脱硫废水处理的几种方式,结合嘉兴电厂的实际情况,提出了废水排入渣系统的实验方案,并对实验数据进行了分析。在此基础上,探讨了烟气脱硫废水排入渣系统处理的可行性,分析了该方案存在的问题,并提出了相应的解决办法与建议。
This paper introduces several methods of wastewater treatment from FGD system,according to the instances of Jiaxing power plant,an experimental proposal is schemed,and the date from experiment is analyzed too.Based on the results of experiment,the feasibility of discharging wastewater from FGD system into ash-sluicing system is discussed,some problems resulted from the blending process is analyzed too,in view of these problems,some recommended resolutions are put forward.

关键词(KeyWords): 烟气脱硫;渣水系统;废水处理;腐蚀
FGD;ash-sluicing system;wastewater treatment;corrosion

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 陈彪,许超,赵琦,符岳全
CHEN Biao1,XU Chao2,ZHAO Qi1,FU Yue-quan3(1.Zhejiang Electric Power Test and Research Institute

DOI: 10.19585/j.zjdl.2010.02.010

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享